In June the interior work focus was on finalizing sheetrock installation, trimming out windows and doors and working on the flush base detail. Tiling began in the three bathrooms.  We added a niche last minute to Bathroom 3 which was definitely a good call.

Waterproofing on the exterior was covered with finish materials – a lot of the cedar siding was installed this month.  Exterior trim began and this was a big job for sure. The stucco on the entry facade was done and came out brighter white than we expected.  Now we needed a porch and a whole lot more interior work!